Modernisation district heating system in ZEC Wołomin sp. z o.o. by building the installation the electricity and heat generation installations in cogeneration and by decommissioning individual heat sources
Zakład Energetyki CIeplnej w Wołominie sp. z o.o. ·Poland
About this project
<p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif">Why is the project needed? Which situation or problem does the project aim to address? (provide reference to evidence, include reference to the relevant laws or policies, where relevant) </span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif"><span style="color: rgba(255, 0, 0, 1)">One of the main problems is the emission of greenhouse gases, dust and tar substances, namely soot from the combustion of a coal. In view of the new emission standards, it necessary to apply measures to reduce inter alia emissions by generating heat and electricity from alternative fuels (RES). This problem is directly caused by the technical condition of the equipment in use, the type and quality of the fuel to be burned and the method of exhaust gas treatment.</span></span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif">How will the project address these challenges? (please summarize the main activities and deliverables plannedto address these challenges) </span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif"><span style="color: rgba(255, 0, 0, 1)">The project envisages the construction of a cogeneration installation for the production of heat and electricity using RES (biomass) and the decommissioning of two individual heat sources (connection to the heat grid).The construction of a cogeneration installation will enable the statute for an efficient district heating system to be achieved, the increase in RES generation and contribute to lower CO2 emissions to air, and to improve the energy efficiency of an existing district heating plant.</span></span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif">What does the project plan to achieve? </span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif"><span style="color: rgba(255, 0, 0, 1)">The project will contribute to reducing CO2 emissions, non-renewable primary energy consumption and to raising public awareness of energy efficiency and renewable energy use RES renewable energy sources.</span></span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif">Who is expected to benefit from this project and how will they benefit? </span></span></span></span></p> <p><span style="font-size: 11pt"><span style="font-family: "Calibri", sans-serif"><span style="font-size: 10pt"><span style="font-family: "Arial", sans-serif"><span style="color: rgba(255, 0, 0, 1)">The target group of the project is the customers of heat and electricity.The project will improve the environment,which will have a positive impact on all inhabitants of Wołomin and the surrounding area.</span></span></span></span></span></p>