Skip to main content
An initiative of Iceland, Liechtenstein & Norway
EEA and Norway Grants Results & Data Portal Site search will be enabled once the search service is connected.
Funding period

Showing all data for 2014–2021

Completed

Closure of the temporary waste storage warehouse in the town of Gura Humorului, Suceava County

Gura Humorului City Hall ·Romania

€1.4m
Grant awarded
Environment, Climate Change Adaptation and Ecosystems
Programme
24 November 2022
Signed

About this project

<p style="text-align: justify"><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">The project aims the neutralization of the area from the point of view of environmental impact.</span></span></span></span></p> <p style="text-align: justify"><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">The <strong>general objective</strong> is the i</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">mprovement of the state of the environment and the reduction of the adverse effects of pollution generated by the temporary landfill.&nbsp;</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif"><strong>Specific objectives</strong> are: (1)&nbsp;</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">Improvement of the capacity of the city to manage the risks involved by the chemical substances and dangerous waste; (2) i</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">mprovement of the ecological state of the habitat which is occupied by the temporary landfill through the rehabilitation of the area.</span></span></span></span></p> <p style="text-align: justify"><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><strong><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif"><span style="color: #000000">The main activities are:&nbsp;</span></span></span></strong><span style="font-size: 11pt"><span style="font-family: &quot;Calibri&quot;, sans-serif"><span style="color: #000000">A1. </span></span></span><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">Mobilization of management and implementation team;&nbsp;&nbsp;A2. Contracting and the execution of services (A.2.1. The contract for project management services;&nbsp;A.2.2. The contract for the elaboration of the technical design and technical assistance during the execution of works;&nbsp;.2.3. The contract for the verification of the technical design and for delivering&nbsp;Verification Reports of the Technical Design;&nbsp;A.2.4. The contract for information and communication services;&nbsp;A.2.5. The contract for financial audit services;&nbsp;</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">A.2.6. The contract for site inspection)&nbsp; and works;(A.2.7. The contract for works).&nbsp;&nbsp;</span></span></span></span></p> <p style="text-align: justify"><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">The implementation of the project has, as on short term effect, the elimination of an important pollution source and rehabilitation of the area. On medium and long term, leads to the accumulation of experience for public local administration in monitoring and managing of a pollution source.</span></span></p> <p style="text-align: justify">The<strong>&nbsp;</strong><strong>the direct (outputs) result of the project</strong><strong>&nbsp;consists in&nbsp; 1 temporary landfill closed and the&nbsp;</strong><strong>indirect (outcomes) result of the project refers to</strong>&nbsp;t<span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">he population benefiting from the measures to close the temporary landfill - the population of Gura Humorului City of&nbsp;</span></span><span style="font-size: 11.5pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">17.839 inhabitants.</span></span></p>