Skip to main content
An initiative of Iceland, Liechtenstein & Norway
EEA and Norway Grants Results & Data Portal Site search will be enabled once the search service is connected.
Funding period

Showing all data for 2014–2021

Completed

Closure of temporary municipal waste landfills in Botosani Municipality, Botosani County (SST-BT)

Administrative Territorial Unit Botosani County ·Romania

€2.5m
Grant awarded
Environment, Climate Change Adaptation and Ecosystems
Programme
24 November 2022
Signed

About this project

<p style="text-align: justify"><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 12pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">Specifically, this project propose interventions on 3 SST, marked separately but located in the same area, creating a compact area of landfills occupying a total area of 3.04 ha, with a storage capacity of 100450 mc and reaching a height of about 8 m. The land on which the 3 SST are located, is in the public domain of the Botosani Municipality of Botosani. The 3 SST</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 12pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">&nbsp;for household waste entered into service in 2012 and ceasing their activity in September 2016.&nbsp;</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><span style="font-size: 12pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">Since taking over the 3 SST from the sanitation operator SC Urban Serv SA (by HCL no. 281/18.09.2020), UAT Botosani Municipality tried to identify solutions for their permanent closure.&nbsp;</span></span></span></span><span style="font-size: 10pt"><span style="font-family: &quot;Trebuchet MS&quot;, sans-serif"><strong><span style="font-size: 12pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">The specific objectives</span></span></strong><span style="font-size: 12pt"><span style="font-family: &quot;Calibri&quot;, sans-serif">&nbsp;of the project are:&nbsp;<strong>1.</strong><span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><strong><span style="font-family: &quot;Calibri&quot;, sans-serif">Determination of the impact of the closure of 3 temporary municipal landfills on the environment in 20 months of project implementation; 2.&nbsp;</span></strong></span></span></span></span></span></span><span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><strong><span style="font-family: &quot;Calibri&quot;, sans-serif">Planning and implementation of the plan of measures to close the 3 temporary municipal landfills (development of the works -&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">excavations and fillings in the body of the warehouse;&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">re-retention and compaction of the waste;&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">installation of the leachate collection system; application of the final closure layers;&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">storm-water collection works;&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">the storage gas collection system;&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">perimetral fencing and access gate;&nbsp;<span style="font-size: 12pt"><span style="font-family: &quot;Times New Roman&quot;, serif"><span style="font-family: &quot;Calibri&quot;, sans-serif">the construction of the building elements necessary for the monitoring of the warehouse in the post-closure period; integration works in the landscape)</span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span>&nbsp;3.&nbsp;Promoting the pilot intervention carried out with the support of the EEA Financial Mechanism 2014-2021, during the 20 months of implementation of the project.&nbsp;</span></strong></span><span style="font-family: &quot;Calibri&quot;, sans-serif">This will improve the quality of the environment as well as the quality of life of the citizens of Botoşani.&nbsp;</span><span style="font-family: &quot;Calibri&quot;, sans-serif">The project is considered a pilot one, since its implementation, as proposed in the project, may generate a model of best practice, which might be multiplied by several other territorial administrative units in the country.&nbsp;</span></span></p>

Project partners

  • National Institute for Research and Development in Environmental Protection Project partner· Romania