Skip to main content
An initiative of Iceland, Liechtenstein & Norway
EEA and Norway Grants Results & Data Portal Site search will be enabled once the search service is connected.
Funding period

Showing all data for 2014–2021

Projects explorer

Search and filter across the full portfolio of supported projects. Every filtered view has a shareable link and is exportable.

Project locations Select a country to filter · shaded by projects
IcelandLiechtensteinNorwayMalta 31Cyprus 32

Hover or tab to a country for its figures.

1–100 101–350 351–900 900+ Nothing recorded Donor state Not part of the Grants

Hungary has nothing recorded in this period. Its outline stays on the map, unmarked.

View data for “Project locations”
Project locations
CountryProjects
Poland1,860
Romania1,103
Czechia832
Bulgaria588
Portugal410
Slovakia370
Latvia335
Estonia317
Croatia304
Lithuania266
Greece246
Slovenia139
Cyprus32
Malta31

193 of 6,887 projects

Export CSV
Shape of these results Median grant €300k · mean €432k
Under €3k: 0 projects€3k–€10k: 5 projects€10k–€30k: 4 projects€30k–€100k: 11 projects€100k–€300k: 77 projects€300k–€1m: 78 projects€1m–€3m: 18 projects€3m–€10m: 0 projects€10m–€30m: 0 projects€30m and over: 0 projectsMedianMeanWhere projects cluster · relative, 24 steps per decadeThe 25 largest projects, individuallyBest usage of geothermal water in Iosia-South neighborhood: €2mIncreased geothermal energy production capacity - infrastructural activities at the drillhole Korenovo GT-1: €1.9mInstallation of a system of heat pumps with seawater for the needs of the City Pool in Dubrovnik: €1.9mReduce the greenhouse gas emissions through biogas production use into electricity and thermal energy: €1.8mMicro hydropower with dam on Rebra River, MHC Parva: €1.8mLow emissions with high and sustainable efficiency in Sfantu Gheorghe key public buildings: €1.8mPhotovoltaic power plant – Traian Blajovici Parking in Oradea: €1.7mBest usage of geothermal water: €1.7mEstablishment of the national training center for nearly Zero Energy Buildings (nZEB): €1.6mIncreasing energy efficiency for public water supply and sewerage services of APASERV Satu Mare: €1.5mHybrid energy efficiency system using geothermal energy, applied on the Petroleum-Gas University of Ploiesti: €1.4mEnergy performance and indoor comfort significant increase in Turda public schools: €1.3mIncreasing the energy efficiency of the public lighting system in Bârlad: €1.3mIncreasing geothermal energy production for consumers in the tourist area of Tasnad City: €1.2mSea for Heritage Energy Transition: €1.2mGood energy - solar energy for energy transition: €1.1mEnergy efficiency and increased comfort in the building of the Home for the elderly in Alba Iulia: €1.1mIncreasing the energy efficiency of the public lighting system in Pitești: €1.1mSolarization of Institutions of the City of Zagreb: €994kSustainable Energy Efficiency and Comfort significant increase in Tarnaveni key public buildings: €991kIncreasing the capacity to produce renewable energy in Hârșova: €968kR.E.S. and Circular Economy in an Academic Community as an Example for Smart Sustainable Development: €954kOne Sun Connecting North and South: €807kUse of geothermal energy for heating purposes in the city of Karlovac – PREP4KaGT-1: €802kPhotovoltaic System for Own Consumption in Barbatesti and Bals Transformer Stations: €746k
View data for “Projects by grant size, 2014–2021”
Projects by grant size, 2014–2021
Grant sizeProjects
Under €3k0
€3k–€10k5
€10k–€30k4
€30k–€100k11
€100k–€300k77
€300k–€1m78
€1m–€3m18
€3m–€10m0
€10m–€30m0
€30m and over0
Median grant€300k
Mean grant€432k
Largest projects in this selection
Largest projectsGrant
Best usage of geothermal water in Iosia-South neighborhood€2m
Increased geothermal energy production capacity - infrastructural activities at the drillhole Korenovo GT-1€1.9m
Installation of a system of heat pumps with seawater for the needs of the City Pool in Dubrovnik€1.9m
Reduce the greenhouse gas emissions through biogas production use into electricity and thermal energy€1.8m
Micro hydropower with dam on Rebra River, MHC Parva€1.8m
Low emissions with high and sustainable efficiency in Sfantu Gheorghe key public buildings€1.8m
Photovoltaic power plant – Traian Blajovici Parking in Oradea€1.7m
Best usage of geothermal water€1.7m
Establishment of the national training center for nearly Zero Energy Buildings (nZEB)€1.6m
Increasing energy efficiency for public water supply and sewerage services of APASERV Satu Mare€1.5m
Hybrid energy efficiency system using geothermal energy, applied on the Petroleum-Gas University of Ploiesti€1.4m
Energy performance and indoor comfort significant increase in Turda public schools€1.3m
Increasing the energy efficiency of the public lighting system in Bârlad€1.3m
Increasing geothermal energy production for consumers in the tourist area of Tasnad City€1.2m
Sea for Heritage Energy Transition€1.2m
Good energy - solar energy for energy transition€1.1m
Energy efficiency and increased comfort in the building of the Home for the elderly in Alba Iulia€1.1m
Increasing the energy efficiency of the public lighting system in Pitești€1.1m
Solarization of Institutions of the City of Zagreb€994k
Sustainable Energy Efficiency and Comfort significant increase in Tarnaveni key public buildings€991k
Increasing the capacity to produce renewable energy in Hârșova€968k
R.E.S. and Circular Economy in an Academic Community as an Example for Smart Sustainable Development€954k
One Sun Connecting North and South€807k
Use of geothermal energy for heating purposes in the city of Karlovac – PREP4KaGT-1€802k
Photovoltaic System for Own Consumption in Barbatesti and Bals Transformer Stations€746k
Download CSV, data for “Projects by grant size, 2014–2021”

Grants in this selection run from €5k to €2m. The mean sits above the median because a small number of very large projects pull it up: the median is the better description of a typical grant.

193 projects match the current filters.

Filters

Programme area
Beneficiary country
Programme
Status
Partnership