Skip to main content
An initiative of Iceland, Liechtenstein & Norway
EEA and Norway Grants Results & Data Portal Site search will be enabled once the search service is connected.
Funding period

Showing all data for 2014–2021

Projects explorer

Search and filter across the full portfolio of supported projects. Every filtered view has a shareable link and is exportable.

Project locations Select a country to filter · shaded by projects
IcelandLiechtensteinNorwayMalta 31Cyprus 32

Hover or tab to a country for its figures.

1–100 101–350 351–900 900+ Nothing recorded Donor state Not part of the Grants

Hungary has nothing recorded in this period. Its outline stays on the map, unmarked.

View data for “Project locations”
Project locations
CountryProjects
Poland1,860
Romania1,103
Czechia832
Bulgaria588
Portugal410
Slovakia370
Latvia335
Estonia317
Croatia304
Lithuania266
Greece246
Slovenia139
Cyprus32
Malta31

126 of 6,887 projects

Export CSV
Shape of these results Median grant €1.2m · mean €1.6m
Under €3k: 0 projects€3k–€10k: 0 projects€10k–€30k: 0 projects€30k–€100k: 1 project€100k–€300k: 14 projects€300k–€1m: 38 projects€1m–€3m: 53 projects€3m–€10m: 20 projects€10m–€30m: 0 projects€30m and over: 0 projectsMedianMeanWhere projects cluster · relative, 24 steps per decadeThe 25 largest projects, individuallyConstruction of a stillage methanation installation with a cogeneration unit with a capacity of up to 5 MWe at the biorefinery plant in Strzyżów: €7mConstruction of the New Combined Heat and Power Plant Czechnica: €7mSupport for environmental protection by Firma Oponiarska Dębica S.A. through investment in high-efficiency cogeneration sources: €7mThermomodernization of 9 selected educational buildings in the Capital City of Warsaw – part 2: €5.4mConstruction of gas cogeneration with a capacity of about 8 MWe with a cooling installation, energy storage and heating network in Siedlce: €5mConstruction of a heat pump as a new power source for the municipal heating network in Wrocław: €4.9mDrilling the Turek GT-2 well, construction of a geothermal heating plant and a pipeline between the Turek GT-1 well and the Turek GT-2 well: €4.5mConstruction of a cogeneration gas source in Zakłady Górniczo-Hutniczych Bolesław S.A.: €4.2mConstruction of high-efficiency cogeneration sources powered by gas fuel in the city of Rybnik, in order to secure heat supplies for the city's residents.: €4mThe investment program for the Zgierz Power Plant – building new generating unit: €3.9mThermomodernization of the school buildings of Gmina Bochnia: €3.9mImproving energy efficiency in school buildings in the Police Poviat: €3.7mConstruction of a stillage methanation plant distillery together with a cogeneration unit with a capacity of up to 3.6 MWe at the distillery plant in Zbiersk: €3.7mRenewal and revitalization of green areas in Polanica-Zdroj including green-blue infrastructure for the needs of adapting of the city climate changes: €3.6mThermomodernization of 5 selected educational buildings in the Capital City of Warsaw – part 1: €3.6mMikołów for Climate - implementation of investments in the field of blue and green infrastructure in the City: €3.4mReplacement of a WR-25 coal-fired boiler with a wood-chip-fired biomass boiler with a fuel store and accompanying infrastructure in the PEC Ełk heat plant: €3.3mModernisation district heating system in ZEC Wołomin sp. z o.o. by building the installation the electricity and heat generation installations in cogeneration and by decommissioning individual heat sources: €3.3mThermomodernization of Public Primary School No 2 in Olesno: €3.3mKowary in green and blue: €3.1mEagerly against climate changes – green-blue infrastructure in Czechowice-Dziedzice commune: €2.9mThe implementation of green and blue infrastructure in communities located in municipalities belonging to the Union of the Wisłoka River Basin Communes: €2.8mConstruction of a geothermal cogeneration installation for the production of heat, electricity and cold at Chochołowskie Thermal Baths (HYDRO-GEO): €2.8mComprehensive thermal modernization of primary school buildings in the Rogoźno Commune: €2.8mConstruction of a stillage methanation plant distillery together with a cogeneration unit with a capacity of up to 1.6 MWe at the distillery plant in Tursko: €2.7m
View data for “Projects by grant size, 2014–2021”
Projects by grant size, 2014–2021
Grant sizeProjects
Under €3k0
€3k–€10k0
€10k–€30k0
€30k–€100k1
€100k–€300k14
€300k–€1m38
€1m–€3m53
€3m–€10m20
€10m–€30m0
€30m and over0
Median grant€1.2m
Mean grant€1.6m
Largest projects in this selection
Largest projectsGrant
Construction of a stillage methanation installation with a cogeneration unit with a capacity of up to 5 MWe at the biorefinery plant in Strzyżów€7m
Construction of the New Combined Heat and Power Plant Czechnica€7m
Support for environmental protection by Firma Oponiarska Dębica S.A. through investment in high-efficiency cogeneration sources€7m
Thermomodernization of 9 selected educational buildings in the Capital City of Warsaw – part 2€5.4m
Construction of gas cogeneration with a capacity of about 8 MWe with a cooling installation, energy storage and heating network in Siedlce€5m
Construction of a heat pump as a new power source for the municipal heating network in Wrocław€4.9m
Drilling the Turek GT-2 well, construction of a geothermal heating plant and a pipeline between the Turek GT-1 well and the Turek GT-2 well€4.5m
Construction of a cogeneration gas source in Zakłady Górniczo-Hutniczych Bolesław S.A.€4.2m
Construction of high-efficiency cogeneration sources powered by gas fuel in the city of Rybnik, in order to secure heat supplies for the city's residents.€4m
The investment program for the Zgierz Power Plant – building new generating unit€3.9m
Thermomodernization of the school buildings of Gmina Bochnia€3.9m
Improving energy efficiency in school buildings in the Police Poviat€3.7m
Construction of a stillage methanation plant distillery together with a cogeneration unit with a capacity of up to 3.6 MWe at the distillery plant in Zbiersk€3.7m
Renewal and revitalization of green areas in Polanica-Zdroj including green-blue infrastructure for the needs of adapting of the city climate changes€3.6m
Thermomodernization of 5 selected educational buildings in the Capital City of Warsaw – part 1€3.6m
Mikołów for Climate - implementation of investments in the field of blue and green infrastructure in the City€3.4m
Replacement of a WR-25 coal-fired boiler with a wood-chip-fired biomass boiler with a fuel store and accompanying infrastructure in the PEC Ełk heat plant€3.3m
Modernisation district heating system in ZEC Wołomin sp. z o.o. by building the installation the electricity and heat generation installations in cogeneration and by decommissioning individual heat sources€3.3m
Thermomodernization of Public Primary School No 2 in Olesno€3.3m
Kowary in green and blue€3.1m
Eagerly against climate changes – green-blue infrastructure in Czechowice-Dziedzice commune€2.9m
The implementation of green and blue infrastructure in communities located in municipalities belonging to the Union of the Wisłoka River Basin Communes€2.8m
Construction of a geothermal cogeneration installation for the production of heat, electricity and cold at Chochołowskie Thermal Baths (HYDRO-GEO)€2.8m
Comprehensive thermal modernization of primary school buildings in the Rogoźno Commune€2.8m
Construction of a stillage methanation plant distillery together with a cogeneration unit with a capacity of up to 1.6 MWe at the distillery plant in Tursko€2.7m
Download CSV, data for “Projects by grant size, 2014–2021”

Grants in this selection run from €76k to €7m. The mean sits above the median because a small number of very large projects pull it up: the median is the better description of a typical grant.

126 projects match the current filters.

Filters

Programme area
Beneficiary country
Programme
Status
Partnership